Main Control Room
Scope of Work: Construction Of MCR Building of ground floor(32.8*39.37) Sqft and 1't floor (26.9*13.77)Sqft, With Manpower Supply without materials building work will be in our scope Labor, Mason, Brick work, plastering, Shuttering & Steel Placing, drainage, Welding, safety Tank, Stair case, Soil backfilling in Plinth beam, White Wash & Painting work lnner wall, Outer wall, Lappam work, Scada room & Manager room & DTH drilling allwork will be included in this rate. (As per drawing)